What We Do

Services

The full list of deck work we quote, including jobs that don't fit neatly into 'new deck' or 'repair.'

Home › Services

Everything we take on

Every job below is one we do ourselves across Waukesha.

Deck Installation

We dig and pour footings below Wisconsin's frost line, usually around 42 inches, so the deck doesn't heave when the ground freezes and thaws. Framing runs 2x8 or 2x10 joists at 16 inches on center, hung with galvanized or stainless hangers depending on what's touching the ground. We'll walk you through pressure-treated, cedar, or composite decking before anything gets ordered.

Custom Deck Design

Some yards call for a second level, a wraparound bench, or stairs that land somewhere other than straight off the back door. We draw it out and run the numbers on footings and beam spans before we ever cut a board. If you've got a slope, a walkout basement, or a pool to work around, that's the kind of layout we like to solve.

Deck Repair

Bouncy spots usually mean a joist has twisted or a hanger has rusted through, and we replace what's bad instead of sistering over it and hoping. Railings that wiggle almost always trace back to a post that was never bolted to the frame, just toe-nailed. We fix the failure point, not just the symptom you can see.

Deck Staining & Sealing

We pressure wash, let the wood dry for a couple of days, then sand anything that's gone gray before staining. A semi-transparent oil-based stain is what we recommend for pine or cedar in this climate, reapplied every 2 to 3 years. Skip this step and the end grain soaks up water, which is where rot starts.

Composite Decking

Composite boards like Trex or TimberTech don't require staining and resist the splintering that pressure-treated pine gets after a few summers. The framing underneath still has to be built right, composite is only as good as the joists holding it up. We use hidden fastener systems on most composite jobs so you don't see a screw head on the surface.

Deck Railing Repair & Installation

Wisconsin code generally calls for 36 inch railings on residential decks, with baluster gaps no wider than 4 inches so a small child can't slip through. We've torn out plenty of railings that were never through-bolted to the rim joist, just screwed into the decking. Cable rail, horizontal board, and standard baluster styles are all on the table.

Deck Resurfacing

If the frame underneath is still solid, a whole new deck isn't necessary, just new decking boards and fascia. We check every joist before resurfacing anything, there's no point putting new boards over wood that's already failing. This is usually the cheaper route if your deck is under 15 years old and the structure checks out.

Deck Demolition & Removal

Some decks are past saving, especially if the ledger board has been leaking into the house for years. We tear it out, haul the old lumber away, and check the rim joist and siding behind it for water damage before anything new goes up. Better to find that problem now than after the new deck is built on top of it.

Deck Lighting Installation

Post cap lights, step lights, and under-rail LED strips get wired in while the deck is open, before the decking goes down for good. Low-voltage systems are what we install most, they're safer around wet boards and cheaper to run. We can also retrofit lighting into an existing deck if the framing allows it.

Screened Porch & Deck Additions

A lot of our deck clients end up asking about screening in part of it once the mosquitoes show up in July. We frame the screen porch addition to tie into the existing deck structure instead of building it as a separate project. It's a bigger job than a standard deck, with its own roof line and footings to plan for.

How It Works

Four steps, and no surprises in any of them.

01

We come and look

You tell us what you want doing, we look at what is actually there, and we ask the awkward questions early.

02

You get a price

In writing, itemised, free. If something might add cost later we flag it now rather than at the end.

03

We do the work

Same crew throughout. We cover your floors, keep the dust down and tidy up before we leave each day.

04

We walk it with you

You point out anything you are not happy with and we fix it before the invoice, not after.

Where We Work

All of this, across Waukesha, WI

These are the towns where quoting and scheduling are straightforward, call to check anywhere close by.

Waukesha, WI
Milwaukee, WI
West Allis, WI
Wauwatosa, WI
New Berlin, WI
Menomonee Falls, WI
Brookfield, WI
Oconomowoc, WI
Pewaukee, WI
Mukwonago, WI
Hartland, WI
Delafield, WI
Common Questions

Things worth asking

Questions that come up once a deck project is actually underway.

Does a new deck require a permit?
Most municipalities around Waukesha require a permit for any deck attached to the house or more than 30 inches above grade, and an inspector checks the footings before decking goes down. Permit handling is typically included as part of the job rather than left to the homeowner.
How long does it take to build a deck?
A standard single-level deck, roughly 300 to 400 square feet, takes about one to two weeks from the first footing to the last board. Multi-level designs, screened additions, or custom railings usually add a week or two to that timeline.
Can a deck be built to a fixed budget?
Decking material is usually the first place to adjust, since pressure-treated pine costs significantly less than composite for the same square footage. Simplifying the railing style or dropping a second level are other common ways to lower a quote without cutting corners on the frame underneath.
Do you guarantee the work on a deck?
Workmanship is typically covered for a set period after completion, and lumber or composite products carry their own manufacturer warranties, ranging from 15 years to limited lifetime depending on the brand. Warranty terms should be spelled out in writing as part of the final paperwork.
Who do I talk to once a deck project starts?
A single point of contact typically handles scheduling and questions for the length of a deck project, so updates don't require chasing down different people.
What decking materials are available?
Pressure-treated pine, cedar, and composite brands like Trex and TimberTech are the main options, each with different upfront cost and upkeep. Pine requires staining every 2 to 3 years, cedar every 3 to 4, and composite just requires occasional cleaning, no staining at all.
Can I still use my yard while a deck is being built?
The area directly around the footing holes and material staging stays off limits for safety, but the rest of the property is usable throughout construction. Saw and nail gun noise is concentrated during daytime working hours.
How should I prepare the yard before a deck crew arrives?
Clearing patio furniture, grills, and potted plants away from the existing deck or build area saves time on the first day. Marking the location of buried sprinkler lines or invisible fence wire is also worth doing before footings get dug.
What happens if rot or damage is found once an old deck comes off?
Ledger board rot, siding damage, or a soft rim joist gets flagged immediately, with photos, before any new framing covers it up. That repair gets priced separately and discussed before work continues, rather than appearing as a surprise on the final invoice.
How should a finished deck be maintained?
Pressure-treated and cedar decks need restaining every 2 to 3 years and a yearly check for popped fasteners or soft boards near ground contact points. Composite decking mainly needs washing with soap and water a couple times a year to keep pollen and mildew from building up on the surface.

Not sure what you need?

Describe the problem and we will tell you what it probably is. No obligation.

Call (414) 488-6904